MJR Controls Ltd Credentials

MJR Controls Ltd1

+44 (0)1642 762 151

MJR Controls Ltd
85 Willows Court
Teesside Industrial Estate
Thornaby
Stockton on Tees
TS17 9PP
United Kingdom

06.01.2011

MJRCONTROLS NOW UK REPRESENTATIVES FOR EMRI

        It is with great pleasure we can now announce mjr controls will be the UK represe...

Read more ›

Waste Recycling Plant Electrical Power & Automation System

Project Details

The latest Government and EU guidelines on waste management have led to a number of companies investing heavily in the design and development of integrated waste recycling plants.

In order to operate the process economically and efficiently, a high level of automation is required.

High yields are closely dependent upon effective and robust control of the process.

During 2004, we were contracted by one such company to design, build, install and commission an integrated automation system for a prototype/demonstrator plant.

The entire plant is controlled by the operators from a central control console inside the control room (above) via HMIs and various controls.

The plant automation hardware platform is based around Proface 
GLC Graphical Logic Controllers and Flex Network Distributed I/O.

This connects to a containerised variable speed drive suite that directly controls machinery such as Bagsplitters, Transfer Conveyors, Streamers, Composters etc.

‹ Back to Project & References