Flexible Pipelay System Build

Project Details

For the past ten years we have been heavily involved in the construction, testing and mobilisation of a wide range of offshore construction and subsea equipment.

In 2008 we carried out the full electrical installation for Amclyde Norson (part of National Oilwell Varco) on a large Flexible Pipelay System.

Work included...

  • Planning and installation of cable support systems.
  • Supply of equipment and materials.
  • Installation, termination and testing of all power, instrument, data and control cabling.
  • Full system hook up for pre FAT testing and commissioning.
  • Assisting client commissioning engineers with FAT.
  • Disconnection and preparation for system shipping.

We offer a complete electrical installation service to the marine, industrial and offshore engineering sectors including system build and vessel mobilisation.