+44 (0)1642 762 151
MJR Controls Ltd
85 Willows Court
Teesside Industrial Estate
Thornaby
Stockton on Tees
TS17 9PP
United Kingdom
MJR appointed as UK agents for Samsung Heavy Industries
Summary of References & Experience
It is not possible to fully describe the wide range of projects undertaken over the last two decades, however the summary below aims to provide a 'snapshot' of our activities, past, present and future. If you require any further information on our capabilities, experience and references please do not hesitate to request further information or contact us.
|
Due to continual reliability problems, age and availability of spares, the owner decided to replace all three of the vessels main diesel generators.
A refit period was not due and the vessel was committed to a long term charter, therefore in order to keep the vessel trading the
|
|
After failure of a Main Engine crankshaft, MJR were contracted to design and replace the safety systems on P&O European Ferries 'European Seafarer'.
The existing cassette and card based system was found to be unsafe as removal of cards to stop nuisance alarms could lead to inhi
|
|
Reducing unnecessary machinery running hours can make dramatic savings on running costs.
This LPG Carrier managed by Hanseatic Shipping had to run all four of its' diesel generators continuously to enable the cargo compressors to operate at full capacity.
This meant that much of the time it
|
|
Operating in the marine and offshore industry we're used to working to impossibly tight deadlines.
When a fire in the emergency generator compartment of one of our customers vessels rendered it inoperable we were asked to assist with urgent repairs.
Within 3 weeks we had designed,
|
|
In 2001, United European Car Carriers (UECC) contracted MJR to deliver a major automation and electrical system upgrade to 'M/V Autocarrier' at Germany's Lloyd Werft Yard in Bremerhaven.
The project included:
Replacement of the existing obsolete 20 year old Machinery Monitoring & Alarm S
|