Safe and successful installation of IMECA Pipe-lay Tower System
Summary of References & Experience
It is not possible to fully describe the wide range of projects undertaken over the last two decades, however the summary below aims to provide a 'snapshot' of our activities, past, present and future. If you require any further information on our capabilities, experience and references please do not hesitate to request further information or contact us.
|
In June 2012 we safely and successfully completed a large scale mobilisation project for McDermott.
The IMECA Pipe-lay Tower System was installed aboard the
new-build North Ocean 105 offshore construction vessel.
Work included:
Mobilisation
of back deck equipment in
|
|
During 2008 we were contracted by Tekmar Subsea to provide a turnkey electrical design, build, outfit and mobilisation package for a Multi Purpose Handling System (MPHS) for Acergy.
The Multi Purpose Handling System (MPHS) is an extremely versatile lifting appliance used for deploy
|
|
When she was delivered from the Kawasaki Heavy Industries Shipbuilding & Engine Works in Nagasaki in 1995, NYK Vega (now MSC Messina) was one of the largest container vessels afloat.
She was equipped with a very sophisticated power generation and management system which enabled the ves
|
|
For the past ten years we have been heavily involved in the construction, testing and mobilisation of a wide range of offshore construction and subsea equipment.
In 2008 we carried out the full electrical installation for Amclyde Norson (part of National Oilwell Varco) on a large Flex
|
|
Maersk Responder was delivered in 2000 as a Cable Installation Vessel and later converted to a Multipurpose Offshore Construction Vessel.
During this conversion all of the Hydralift cable installation deck machinery was decommissioned, removed and put into long term storage together with its 
|