Safe and successful installation of IMECA Pipe-lay Tower System

MJR have safely and successfully completed a large scale mobilisation project for McDermott on time and with no injuries. T...

Read more ›

Projects & References

Summary of References & Experience

It is not possible to fully describe the wide range of projects undertaken over the last two decades, however the summary below aims to provide a 'snapshot' of our activities, past, present and future. If you require any further information on our capabilities, experience and references please do not hesitate to request further information or contact us. 

Large scale mobilisation for McDermott
In June 2012 we safely and successfully completed a large scale mobilisation project for McDermott.   The IMECA Pipe-lay Tower System was installed aboard the new-build North Ocean 105 offshore construction vessel. Work included:  Mobilisation of back deck equipment in
Subsea Multi Purpose Handling System
During 2008 we were contracted by Tekmar Subsea to provide a turnkey electrical design, build, outfit and mobilisation package for a Multi Purpose Handling System (MPHS) for Acergy. The Multi Purpose Handling System (MPHS) is an extremely versatile lifting appliance used for deploy
Containership - Power Generation System Upgrade
When she was delivered from the Kawasaki Heavy Industries Shipbuilding & Engine Works in Nagasaki in 1995, NYK Vega (now MSC Messina) was one of the largest container vessels afloat. She was equipped with a very sophisticated power generation and management system which enabled the ves
Flexible Pipelay System Build
For the past ten years we have been heavily involved in the construction, testing and mobilisation of a wide range of offshore construction and subsea equipment. In 2008 we carried out the full electrical installation for Amclyde Norson (part of National Oilwell Varco) on a large Flex
Cable Ship Conversion & Mobilisation
Maersk Responder was delivered in 2000 as a Cable Installation Vessel and later converted to a Multipurpose Offshore Construction Vessel. During this conversion all of the Hydralift cable installation deck machinery was decommissioned, removed and put into long term storage together with its 