MJR Controls Ltd Credentials

MJR Controls Ltd1

+44 (0)1642 762 151

MJR Controls Ltd
85 Willows Court
Teesside Industrial Estate
Thornaby
Stockton on Tees
TS17 9PP
United Kingdom

27.04.2015

MJR becomes ABB Authorized Value Provider

In order to further strengthen our position as a leading Marine & Offshore Power & Automation Systems Integrator, we ar...

Read more ›

28.06.2012 - Safe and successful installation of IMECA Pipe-lay Tower System

Safe and successful installation of IMECA Pipe-lay Tower System

MJR have safely and successfully completed a large scale mobilisation project for McDermott on time and with no injuries.

The IMECA Pipe-lay Tower System was installed aboard the new-build North Ocean 105 offshore construction vessel.

Work included:

  •  Mobilisation of back deck equipment including 1200 tonne,52m pipe-lay tower, 40ft drive cabinet container, 20ft control container, 40ft HPU container, 20ft workshop.  Installation of all power and communications connections between these.
  •  Installation of CCTV, clear comms, DP alert and survey systems throughout the vessel.

‹ Back to News